|
"
चलो हम भी जी ले ते हैं। "
पीने का मन करता है तो पी लेता हूँ फटी जिदंगी को सपनों के धागे से सिल लेता हूँ। अब तलक कष्ट काटें हैं कष्ट काटने की प्रेकि्टस हैं ना चाहत के, ऐसे हीजी लेता हूँ। रम पी लु या गम पी लू गुLसा पी लु या सEमान से ऐ " शिवराम" जरा सी दारु ही पी लु । कया रखा हैं, इस अपमानजनक दुनिया मे, में जरा सी, इजजत पाने को, कु ना मैं, थोड़ा सा सोमरस पी लु । खाली खाली बचपन बीता, खाली बीता यौवन, खालीपन को भरने को, ऐ " शिवराम" चले बचचन की" मधुशाला" मे इक घूंट मधु पी लु । |
Show details
|
Monday, 27 January 2020
" चलो हम भी जी ले ते हैं। "
What is Life ?
What is
Life ?
Think & understood,
Life is flower or fade
Its maximum portion depends on you
and
Its minor depends on your surrounds cells.
Although,
Regarding yours surrounding cells,
Again also ,
Its maximum portion depends on ,
Your selection ,
and
Its minor depends on your election.
Whilst your selection or election,
Selection is totally depends
On your desire & ambitions,
Or
Election is absolutely depends
On organization behavior,
On society custom & culture.
At last we should accept,
At least minimum guiltiness of us,
Instead of doggedness,
That the GOD is responsible for us all
failure,
In the context delivered by Loard Krishna to
Arjun
In the KURUKSHETRA battle field in GITA.
My Reflection -1st
Dear
friends,
In
general every men are told that purity should be maintain in life, its useful ,
but in my opinion 100 % purity in any substance physically or in virtual world.
When
the Gold is pure its useless for human life, because pure gold never used in an
ornaments due to softness of its, for enabling its to fabricating or molding of
ornaments some others materials must adding to improving hardness, without
changing of colour appearance for better eye appeal for user, specially for
women.
Even
the water also never used in its pure condition, because of our body demanding
some minerals and we can getting its through water as in natural form. if i
talking about pure water means distilled water, which we find through steam
condensation only, its often useful in research work, not in drinking purpose
for live elements. Some drinking water selling companies are display or showing
advertisements to more mineral add water i.e impure water for better health.
At now
we are discussing of human behavior is also follow the nature of substance,
impurities is needed to maintain good relation in modern society i.e if anyone
asking or telling clearly, plain truth, none of like listen him in well manner,
even someone quarrel with speaker or not give attention , because of plain
truth not like by general man. So at last normal man try to twist the thing or
matter with some adding some impurities by adding additional wrong facts or by
hiding some truth facts, both are harmful for human being , but average man
reminiscent of its.
In
broad view if someone think about citizenship regarding purity or impurities. Pure
men means only and only originator of defined land area reaming all type
citizens are impurities. If we are discussed in concern of some specific
country likes Pakistan, India and United state of America (USA) that the one
thing comes into light the two type of social strata are in existence fertilized
Vs Shekhpathan, originator Vs outsider and black and white person respectively.
If
someone average or normal man try to made himself unknown, I saying to more wisdom man or nock the door of philosopher
in broad view of whole world that the …………………….
Contd…………………..
Myself and mine DiL
eSa vkSj esjk fny
o"ksZ ls ugh ns[kk psgjk]
ftudk]
muds fy,]
:Bus D;ks pkgrk gS]
eq>ls] fny esjk A
fQj “h]
eq>s dksbZ ,rjkt ugh]
fny pkgs rks pkgs mUgs]
feyuk gS rks] tk feys mUgss]
eSa ek¡x ysrk gw¡]
[kkst&[kcj mudh gok lsA
oks fny gS] esjk !
okss ftxj gS] esjk !
oks nnZ gS] esjk !
exj] oks ugha gS
esjk thou iwjk A
eS rqEgs le>k nsrk gw¡]]
lqu esjs fny]
rq le> esjh]
tc oks ! gks uk ldh] laxuh esjh]
vc D;k [kkd cusxh lgsyh rsjh A
vks esjk fny] D;ksa #Brk gSa]
rq
eq>ls]
eSa] csoQk dgrk gw¡] mudks]
vkSj ‘
’kk;n rq dgrk gS] eq>dks]
exj] ,s esjs fny ------ 2]
lp] pkgrk gS] rq tkuuk !
rks lky ds nks fnu] rq
djok¡ pkSFk vkSj osysUVkbu * Ms * dks
tk djds muls iwNuk !
Monday, 13 January 2020
सेक्युलरिज्म व कॉन्स्टिट्यूशनलिज्म
What is secularism and constitunalism
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
इसको इसप्रकार समझीये।
(१) शहद और भारतीय कुत्ता!
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
युर्वेद में #शहद # को अमृत के समान माना गया हैं और मेडिकल साइंस भी शहद को सर्वोत्तम पौष्टिक और एंटीबायोटिक भंडार मानती हैं लेकिन आश्चर्य इस बात का हैं कि शहद की एक बूंद भी अगर कुत्ता चाट ले तो वह मर जाता हैं यानी जो मनुष्यों के लिये अमृत हैं वह *शहद कुत्ते के लिये जहर है।
१) शुद्ध डेढ़ी घीऔर भारतीय मक्खी !
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
# देशी_घी शुद्ध देशी गाय के घी को आयुर्वेद अमृत मानता हैं और मेडिकल साइंस भी इसे औषधीय गुणों का भंडार कहता हैं पर आश्चर्य ये हैं कि मक्खी घी नहीं खा सकती *अगर गलती से देशी घी पर मक्खी बैठ भी जाये तो अगले पल वह मर जाती है*। इस अमृत समान घी को चखना भी मक्खी के भाग्य में नहीं होता!
३) शहद और भारतीय गधा !
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
# मिश्री .. इसे भी अमृत के समान मीठा माना गया हैं आयुर्वेद में हाथ से बनी मिश्री को श्रेष्ठ मिष्ठान्न बताया गया हैं और मेडिकल साइंस हाथ से बनी मिश्री को सर्वोत्तम एंटबायोटिक मानता है लेकिन आश्चर्य हैं कि अगर खर (गधे) को एक डली मिश्री खिला दी जाए तो कुछ समय पश्चात ही उसके प्राण पखेरू उड़ जाएंगे! *ये अमृत समान श्रेष्ठ मिष्ठान मिश्री गधा नहीं खा सकता हैं।
४) शहद और भारतीय कौवा !
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
नीम के पेड़ पर लगने वाली पकी हुई #निम्बोली में सब रोगों को हरने वाले औषधीय गुण होते हैं और आयुर्वेद उसे सर्वोत्तम औषधि ही कहता हैं मेडिकल साइंस भी नीम के बारे में क्या राय रखता है। आप जानते होंगे! लेकिन आश्चर्य ये हैं कि रात दिन नीम के पेड़ पर रहने वाला #कौवा अगर गलती से निम्बोली को चख भी ले तो उसका गला खराब हो जाता हैं *अगर निम्बोली खा ले तो कौवे की मृत्यु निश्चित है*....!!!
इस भारत मे बहुत कुछ हैं जो अमृत समान हैं, अमृत_तुल्य है औषधीय है.....पर इस धरती पर कुछ ऐसे जीव भी हैं जिनके भाग्य में वह अमृत भी नहीं हैं ।
पर भारत के *#मक्खी_कुत्ते_कौवे_गधे* और मीडिया के कीड़ों आदि को अमृत समान औषध की महत्ता समझाने में अपना समय नष्ट न कीजिये।
जिनके भाग्य में समरसता कस अमृत ही नहीं है. वो जीवन भर गंदगी में ही सांस लिये हैं। इसलिये उसे ही अपना सर्वश्रेष्ठ प्रारब्ध समझतें हैं...!
भारत का संविधान *राजनीतिक व सामाजिक बीमारी की सर्वोत्तम औषधि हैं।
क्योंकि वो मेरे भारत को खोखला और बीमार करने वालों से मुक्त करा *भारत को विश्व गुरु बना कर ,सामरिक शक्ति सिद्ध कर भारतीयों का मस्तक गर्व से ऊंचा करने में लगे है*।
भारत के कुत्ते,गधे, मक्खी जैसों को संविधान समरसता समझ में नहीं आ रहा।
कुछ स्वार्थी तत्व एकजुट होकर अमृत को विष सिद्ध करने में जी जान से लगे हैं।
देश के गरीबो को पहले जैसा दीन-हीन अशिक्षित, सम्मान विहीन, दरिद्र बनाने के अनेकों प्रयास में लगे है।
*आप अपने आप को किस श्रेणी में रखते हैं। ये आपके अपने उपर निर्भर है।
इसलिए आने वाली पीढ़ियों के लिए भारतीय समाज के लिए कुछ तो अच्छा करो। जागो और जगाओ।
Thursday, 9 January 2020
What is Sucessfullnes
#सफलता क्या है ??*
*4 वर्ष की उम्र में सफलता यह है कि आप अपने कपड़ों को गीला नहीं करते।*
*8 वर्ष की उम्र में सफलता यह है कि आप अपने घर वापिस आने का रास्ता जानते है।*
*12 वर्ष की उम्र में सफलता यह है कि आप अपने अच्छे मित्र बना सकते है।*
*18 वर्ष की उम्र में मदिरा और सिगरेट से दूर रह पाना सफलता है।*
*25 वर्ष की उम्र तक नौकरी पाना सफलता है।*
*30 वर्ष की उम्र में एक पारिवारिक व्यक्ति बन जाना सफलता है।*
*35 वर्ष की उम्र में आपने कुछ जमापूंजी बनाना सीख लिया ये सफलता है।*
*45 वर्ष की उम्र में सफलता यह है कि आप अपना युवावस्था बरकरार रख पाते हैं।*
*55 वर्ष की उम्र में सफलता यह है कि आप अपनी जिम्मेदारियाँ पूरी करने में सक्षम हैं।*
*65 वर्ष की आयु में सफलता है निरोगी रहना।*
*70 वर्ष की उम्र में सफलता यह है कि आप आत्मनिर्भर हैं किसी पर बोझ नहीं।*
*75 वर्ष की उम्र में सफलता यह है कि आप अपने पुराने मित्रों से रिश्ता कायम रखे हैं।*
*80 वर्ष की उम्र में सफलता यह है कि आपको अपने घर वापिस आने का रास्ता पता है।*
*और 85 वर्ष की उम्र में फिर सफलता ये है कि आप अपने कपड़ों को गीला नहीं करते।*
अंततः यही तो जीवन चक्र है.. जो घूम फिर कर वापस वहीं आ जाता है जहाँ से उसकी शुरुआत हुई है और
*यही जीवन का परम सत्य है।*
*संभाल कर रखिए अपने को*
Wednesday, 8 January 2020
Dhigawra to BNdikuai DL
1. Dhigawra station
Sr. No
|
Utilities
|
Scope of work
|
|
Work status
|
Work in progress
|
||
i
|
ASM
panel room
|
Work completed
|
|
ii
|
Ticket
window queuing area
|
Work completed
|
|
iii
|
Waiting
hall
|
Work completed
|
|
iv
|
Mini
pantry
|
Work completed
|
|
v
|
Relay
Room
|
Work completed
|
|
vi
|
IPS
Room
|
Work completed
|
|
vii
|
Battery
Room
|
Work completed
|
|
viii
|
OFC
Room
|
Work completed
|
|
ix
|
Electrical LT panel room
|
Work completed
|
|
x
|
S
& T DG Room
|
Work completed
|
|
xi
|
FOB
|
Work completed
|
Tube
light fitting provides, but LED rod has not provided due to theft problem.
|
xii
|
Circulating
area
|
No scope
|
|
xiii
|
PF
No. 01 shelter
|
Work completed
|
|
xiv
|
PF
No. 01 open area
|
Work completed
|
|
xv
|
PF
No. 02 shelter
|
Work completed
|
|
xvi
|
PF
No. 02 open area
|
Work completed
|
|
xvii
|
Earthing
|
Work completed
|
|
xviii
|
Approach
road
|
Pole erected
|
LED
light not provide and earthing not provide
|
2.
Rajgarh
station
Sr. No
|
Utilities
|
Scope of work
|
|
Work status
|
Work in progress
|
||
i
|
ASM
panel room
|
Work completed
|
Selector
switch, Ex. fan in toilet, celling fan not prove.
PDC
:20.01.2020
|
ii
|
Booking
window room
|
Work completed
|
Rain water leakage from roof, MCCB has been
brunt by this.
|
Ticket
window queuing area
|
Work completed
|
Switches
and 5/15 Amp socket are broken by public, same may be preplaced prior to CRS.
|
|
iii
|
Waiting
hall
|
Work completed
|
|
iv
|
Mini
pantry / canteen
|
Work completed
|
Tube
rod not provides.
|
v
|
Relay
Room
|
Work completed
|
|
vi
|
IPS
Room
|
Work completed
|
|
vii
|
Battery
Room
|
Work completed
|
|
viii
|
OFC
Room
|
Work completed
|
|
ix
|
Electrical LT panel room
|
Work completed
|
|
x
|
S
& T DG Room
|
Work completed
|
|
xi
|
FOB
|
No scope
|
|
xii
|
Circulating
area
|
No scope
|
|
xiii
|
PF
No. 01 shelter
|
Wiring pending
|
PDC:
20.01.2020
|
xiv
|
PF
No. 01
open
area
|
Work completed
|
|
xv
|
PF
No. 02 shelter
|
No scope
|
|
xvi
|
PF
No. 02 open area
|
No scope
|
|
xvii
|
earthing
|
Work completed
|
Earthing
done , but value not marked and muffing of earth pendings.20.01.2020
|
3. Sure Goath halt station
Sr. No
|
Utilities
|
Scope of work
|
|
Site not ready
|
Work in progress
|
||
i
|
ASM
panel room
|
No scope
|
|
ii
|
Ticket
window queuing area
|
Site not ready
|
|
iii
|
Waiting
hall
|
No scope
|
|
iv
|
Mini
pantry
|
No scope
|
|
v
|
Relay
Room
|
No scope
|
|
vi
|
IPS
Room
|
No scope
|
|
vii
|
Battery
Room
|
No scope
|
|
viii
|
OFC
Room
|
No scope
|
|
ix
|
Electrical LT panel room
|
No scope
|
|
x
|
S
& T DG Room
|
No scope
|
|
xi
|
FOB
|
No scope
|
|
xii
|
Circulating
area
|
No scope
|
|
xiii
|
PF
No. 01 shelter
|
Wiring
work pending due to theft prone work site.
|
|
xiv
|
PF
No. 01 open area
|
Cable laid, surface level is uneven
|
|
xv
|
PF
No. 02 shelter
|
Wiring
work pending due to theft prone work site.
|
|
xvi
|
PF
No. 02 open area
|
Cable laid, Pole erected
|
|
xvii
|
Earthing
|
Pending,
PF No. 01 surface is uneven & no Rly land available behind wall and PF
No. 02, the GL is very lower, it is not confirmed that Engg dept. filling
work done or not for support of wall.
|
|
4. Baswa station
Sr. No
|
Utilities
|
Scope of work
|
|
Work status
|
Work in progress
|
||
i
|
ASM
panel room
|
Wiring work completed
|
Fan
provision work in progress PDC : 20.01.2020
|
ii
|
Ticket
window queuing area
|
Wiring work completed
|
Fan provision work in progress PDC : 20.01.2020
|
iii
|
Waiting
hall
|
Wiring work completed
|
Fan provision work in progress PDC : 20.01.2020
|
iv
|
Mini
pantry
|
Wiring work completed
|
|
v
|
Relay
Room
|
Wiring work completed
|
|
vi
|
IPS
Room
|
Wiring work completed
|
Fan
& Ex. Fan provision work in
progress
|
vii
|
Battery
Room
|
Wiring work completed
|
Fan
and Ex. fan , light provision work in progress
|
viii
|
OFC
Room
|
Wiring work completed
|
Fan
provision work in progress
|
ix
|
Electrical LT panel room
|
Wiring work completed
|
Fan
and light provision work in progress
|
x
|
S
& T fuel room
|
Wiring work completed
|
Fan
and Ex. Fan provision work in progress
|
xi
|
FOB
|
Site not ready
|
Pending
|
xii
|
Circulating
area
|
Pending
|
|
xiii
|
PF
No. 01 shelter
|
Wiring work completed
|
Fan
provision work in progress
|
xiv
|
PF
No. 01 open area
|
Site not ready
|
12
no. foundation casted, balance WIP.
|
xv
|
PF
No. 02 shelter
|
Wiring work completed
|
Fan
provision work in progress
|
PF No. 02 open area
|
Wiring completed
|
PF level lowered by Engg, and pole
removal n again erection is pending: 20.01.2020
|
|
xvii
|
earthing
|
-
|
Pending : 20.01.2020
|
5.Gullana
Halt station
Sr. No
|
Utilities
|
Scope of work
|
|
Work status
|
Work in progress
|
||
i
|
ASM
panel room
|
No scope
|
|
ii
|
Ticket
window queuing area
|
Work completed
|
Wiring
work pending due to theft prone work site and Gate and window still not
provides.
|
Iii
|
Waiting
hall
|
No scope
|
|
iv
|
Mini
pantry
|
No scope
|
|
v
|
Relay
Room
|
No scope
|
|
vi
|
IPS
Room
|
No scope
|
|
vii
|
Battery
Room
|
No scope
|
|
viii
|
OFC
Room
|
No scope
|
|
ix
|
Electrical LT panel room
|
No scope
|
|
x
|
S
& T DG Room
|
No scope
|
|
xi
|
FOB
|
No scope
|
|
xii
|
Circulating
area
|
No scope
|
|
xiii
|
PF
No. 01 shelter
|
Wiring
work pending due to theft prone work site.
|
|
Xiv
|
PF
No. 01
open
area
|
Cable laid, pole erected
|
|
xv
|
PF
No. 02 shelter
|
Wiring
work pending due to theft prone work site.
|
|
Xvi
|
PF
No. 02 open area
|
Cable laid, pole erected
|
|
xvii
|
Earthing
|
Pending
|
|
6
.Bandikuai station.
Sr. No
|
Utilities
|
Scope of work
|
|
Work status
|
Work in progress
|
||
i
|
ASM
panel room
|
No scope
|
|
ii
|
Ticket
window queuing area
|
Site not ready at 2nd entry
|
|
iii
|
Waiting
hall
|
Site not ready at 2nd entry
|
|
iv
|
Mini
pantry /cafeteria
|
Site not ready at 2nd entry
|
|
v
|
Relay
Room
|
Wiring work completed
|
Fan and light provision work in
progress
|
vi
|
IPS
Room
|
Wiring work completed
|
Fan and light provision work in progress
|
vii
|
Battery
Room
|
Wiring work completed
|
Fan and light provision work in
progress
|
viii
|
OFC
Room
|
Wiring work completed
|
Fan and light provision work in
progress
|
ix
|
Electrical LT panel room
|
Wiring work completed
|
Fan and light provision work in progress
|
x
|
S
& T DG Room
|
No scope
|
|
xi
|
FOB
|
Site not ready
|
|
xii
|
Circulating
area
|
Site not ready at 2nd entry
|
|
xiii
|
PF
No. 05 shelter
|
Site not ready at 2nd entry
|
|
xiv
|
PF
No. 05 open area
|
Pole foundation & cable laying work
done on extended portion of JP & AWR end
|
Earthing PDC: 22.01.2020
|
xv
|
PF
No. 06
shelter
|
Site not ready at 2nd entry
|
|
xvi
|
PF
No. 06 open area
|
Site not ready at 2nd entry
|
|
xvii
|
Earthing
|
Pending
|
|
xviii
|
S
& T building AC provision
|
Lights, fan provision work and
earthing pending
|
AC’s copper pipe line work PDC:
20.01.2020
Earthing : 20.01.2020
|
7
. Level crossing (LC’s)
Sr. No
|
Utilities
|
In between stations
|
Scope of work
|
|||||
Wiring
|
Fan
|
Street light
|
Tube light
|
Earthing
|
S & T building
|
|||
I
|
LC No. 134
|
DGW to RHG
|
Work done
|
Work done
|
25.01.2020
|
Crossing pending -
|
||
Ii
|
LC No. 136
|
DGW to RHG
|
Work done
|
Work done
|
Pole erected
|
Work done
|
Complete value not wrote
|
Fan, Ex. Fan, light are pending
25.1.20
|
Iii
|
LC No. 139
|
In RHG yard towards DGW
|
Work done
|
Work done
|
Foundation done
|
Work done
|
Complete value not wrote
|
No scope
|
Iv
|
LC No. 140
|
In RHG yard towards DGW
|
Work done
|
Work done
|
Crossing pending
|
-
|
-
|
Fan, Ex. Fan, light are pending
25.1.19
|
Vi
|
LC No. 142
|
Rajgarh to Baswa
|
Work done
|
25.01.20
|
Foundation done
|
25.01.20
|
Done
|
Fan, Ex. Fan, light are pending
25.1.20
|
Vii
|
LC No. 145
|
Nearest Surer Goath station
|
Work done
|
Done
|
Foundation done
|
done
|
Done
|
Ex.fan
25.01.20
|
Viii
|
LC No. 146
|
Rajgarh to Baswa
|
Work done
|
Work done
|
Foundation done
|
-
|
WIP
|
-
|
Ix
|
LC No. 147
|
Rajgarh to Baswa
|
Work done
|
Work done
|
Foundation done
|
-
|
WIP
|
-
|
X
|
LC No. 156
|
Baswa to Bandikuai
|
Pending
|
WIP
|
WIP
|
-
|
WIP
|
Wiring work pending in S & T bldg
|
Xi
|
LC No. 157
|
Baswa to Bandikuai
|
Work done
|
Work done
|
WIP
|
-
|
WIP
|
-
|
Xii
|
LC No. 160
|
In BKI yard towards Jaipur
|
Work done
|
Work done
|
WIP
|
-
|
WIP
|
-
|
Xiii
|
LC No. 104
|
In BKI yard towards Agara
|
Pending
|
Pending
|
WIP
|
-
|
WIP
|
Wiring work pending in S & T bldg
|
Xiv
|
LC No.103
|
In BKI yard towards Agra
|
Pending
|
Pending
|
WIP
|
-
|
WIP
|
Wiring work pending in S & T bldg
|
Power line track crossing (PLTC)
Pending items are as under :
(a) Earthing : almost earthing done , One location at KM 112 earthing pending
and earthing value not wrote.: PDC 28.01.2020
(b) Earth pit pending: PDC 28.01.2020
(c) Danger notice pending : PDC 28.01.2020
(b) Earth pit pending: PDC 28.01.2020
(d) Anti climbed device / barbed wire : : PDC 28.01.2020
(e) Cable marker Pending: PDC 28.01.2020
Subscribe to:
Posts (Atom)